Erewash Travel Centre

Welcome to the Erewash Sound Travel Centre

Check here before you set out to travel in and around the Erewash area for all the latest traffic and travel updates, 24 hours a day.

You can also hear live updates on-air during the Erewash Sound Breakfast Show (7-9.30am) and Homeward Bound (4-7pm) every weekday on 96.8fm or by clicking the Listen Live buttons here on the website.

Something missing from the following list? Got something to tell us?
Contact us by clicking here or call 0115 930 3450 and we'll tell the rest of the borough!

Live traffic map from around the Erewash area

See all Hotspot Area Maps »

Ilkeston Town Centre

Long Eaton Town Centre

A52 - M1 Jct.25 Island

A52 - Bardills & Bramcote Islands

A52 - Pentagon Island

Roadworks Updates

Plan ahead with our comprehensive list of current, planned and recent completed roadworks in the Erewash area

Roadworks and incidents information provided by ELGIN www.elgin.org.uk. Roadworks Information Database Right copyright © ELGIN. Roadworks Information may contain NTIS Traffic Data copyright © Highways Agency. Roadworks Information may contain TfL Transport Data copyright © Transport for London. Roadworks Information may contain Ordnance Survey data and database rights © Crown copyright.

Summer Rail Disruption

Rail replacement bus services from Long Eaton

30th July to 2nd September

Due to the Derby Resignalling project, fewer trains will run between Derby and Nottingham including both East Midlands Trains and CrossCountry services.  An enhanced bus and coach replacement service will be in operation calling at all stations.

CrossCountry services will continue to operate between Birmingham and Nottingham but will use an alternative route which does not call at Long Eaton, Spondon or Derby.

East Midlands Trains services between Long Eaton and London St Pancras International are not affected.

Also note that 10 spaces in Long Eaton railway station car park will be reserverd for rail replacement bus services.

 

Long Term Roadworks

A52 Derby, Spondon to The Wyvern, Westbound

30th July to 24th August

Single lane between Raynesway and The Wyvern

Lane one closed 24 hours a day for the construction of a new retaining wall alongside The Wyvern. Delays expected.

Narrow lanes and reduced speed limits remain between the Spondon Asda island junction and The Wyvern centre in both directions for widening works and changes to the junction at Pride Park. Due for completion in late 2018.

M1 Derbyshire and Leicestershire, Junctions 25 to 23a

Until late 2018

Construction of smart motorway - reduced speed limits

Three lanes open to traffic in each direction during peak periods.  Activity will take place across the full length of the scheme and during the night. Traffic management and reduced speed limits between junctions 23a and 25 to ensure the safety of the workforce and the travelling public. Night time working hours are 8:00pm to 6:00am.

A6096 Dale Road, Spondon, Derby

Until 10th August 2018

Temporary lights for water mains works

Severn Trent Water replacing water mains along Dale Road from Pheasant Field Drive down to Moor Street, temporary lights moving along the stretch as works take place.  Delays likely at rush hour with possible delays to Ilkeston Flyer and Y3 bus services at times.

 

Roadworks Updates
Roadworks and incidents information provided by ELGIN www.elgin.org.uk. Roadworks Information Database Right copyright © ELGIN. Roadworks Information may contain NTIS Traffic Data copyright © Highways Agency. Roadworks Information may contain TfL Transport Data copyright © Transport for London. Roadworks Information may contain Ordnance Survey data and database rights © Crown copyright.

A6096 Millership Way, Ilkeston, Derbyshire

03 August — 04 August

   

Delays likely Traffic control (two-way signals)

 

Works location: P44146 - Erewash River

   

Works description: P44146 - Erewash River - Traffic Managment for Bridge Inspection

   

Responsibility for works: Derbyshire

   

Current status: Planned work about to start

   

Works reference: DF02057300865

   

A609 Nottingham Road, Ilkeston, Derbyshire

05 August — 06 August

   

Delays likely Traffic control (priority working)

 

Works location: Outside 24

   

Works description: Lay 1.5m of new duct with a new tee in footway

   

Responsibility for works: VIRGIN MEDIA

   

Current status: Planned work about to start

   

Works reference: NK100/NEMRBU/CX00030130A

   

B5010 Derby Road, Sandiacre, Long Eaton, Derbyshire

31 July — 02 August

   

Delays likely Traffic control (two-way signals)

 

Works location: O/S 98

   

Works description: Non S Replace MH HWAY Replacement of noisy and rattling man hole in carriageway Job in Carriageway (10mm StoneMastic Asphalt )

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9022102/000011915840A

   

Cotmanhay Road, Cotmanhay, Ilkeston, Derbyshire

01 August — 04 August

   

Delays likely Traffic control (two-way signals)

 

Works location: ADJ 401 COTMANHAY ROAD

   

Works description: Short 0.1-4.5m Full Ex 25mm MDPE New water connection - To excavate 4.5m to connect new plots water supply onto mains located in carriageway - 2 way TTL manual control Job in Carriageway (10mm Bitmac (Tarmac) )

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9205401/000006454627

   

Longmoor Lane, Breaston, Long Eaton, Derbyshire

06 August — 18 September

   

Delays likely Road closure

 

Works location: Between Risley Lane and Holly Avenue

   

Works description: Renew 745m of existing main by the Directional Drill and Pipeburst methods. Transfer 135 services Renew 745m of existing main by the Directional Drill and Pipeburst methods. Transfer 135 services Renew 745m of existing main by the Directional Drill and Pipeburst methods. Transfer 135 services

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB505A6W/11330320A

   

M1

31 July — 31 July

   

Delays likely Lane closure

 

Works location: 24/7 entry and exit slip road hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

31 July — 31 July

   

Delays likely Lane closure

 

Works location: 24/7 hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

31 July — 01 August

   

Delays likely Lane closure

 

Works location: Lane 1,2,3 closure southbound. Left Permanent Lane 2 Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 3 Closed.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

31 July — 01 August

   

Delays likely Road closure

 

Works location: Entry slip road closed southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

31 July — 01 August

   

Delays likely Lane closure

 

Works location: Lane 1,2 closed northbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.

   

Works description: M1 northbound and southbound Jct 25 to 24a. 24/7 hardshoulder closures narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1283

   

M1

01 August — 01 August

   

Delays likely Lane closure

 

Works location: 24/7 entry and exit slip road hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

01 August — 01 August

   

Delays likely Lane closure

 

Works location: 24/7 hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

01 August — 02 August

   

Delays likely Lane closure

 

Works location: Lane 1,2 closed northbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.

   

Works description: M1 northbound and southbound Jct 25 to 24a. 24/7 hardshoulder closures narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1283

   

M1

01 August — 02 August

   

Delays likely Lane closure

 

Works location: Lane 1,2,3 closure southbound. Left Permanent Lane 2 Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 3 Closed.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

01 August — 02 August

   

Delays likely Road closure

 

Works location: Exit slip road closed northbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

01 August — 02 August

   

Delays likely Road closure

 

Works location: Entry slip road closed southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

02 August — 02 August

   

Delays likely Lane closure

 

Works location: 24/7 entry and exit slip road hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

02 August — 06 August

   

Delays likely Lane closure

 

Works location: 24/7 hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

02 August — 03 August

   

Delays likely Road closure

 

Works location: Entry slip road closed southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

02 August — 03 August

   

Delays likely Road closure

 

Works location: Exit slip road closed northbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

02 August — 03 August

   

Delays likely Lane closure

 

Works location: Lane 1,2 closed northbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.

   

Works description: M1 northbound and southbound Jct 25 to 24a. 24/7 hardshoulder closures narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1283

   

M1

03 August — 03 August

   

Delays likely Lane closure

 

Works location: 24/7 entry and exit slip road hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

03 August — 04 August

   

Delays likely Lane closure

 

Works location: Lane 1,2 closed northbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.

   

Works description: M1 northbound and southbound Jct 25 to 24a. 24/7 hardshoulder closures narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1283

   

M1

03 August — 04 August

   

Delays likely Road closure

 

Works location: Exit slip road closed northbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

03 August — 04 August

   

Delays likely Road closure

 

Works location: Entry slip road closed southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

04 August — 06 August

   

Delays likely Lane closure

 

Works location: 24/7 entry and exit slip road hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

06 August — 07 August

   

Delays likely Road closure

 

Works location: Exit slip road closed northbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

06 August — 07 August

   

Delays likely Lane closure

 

Works location: Lane 1,2,3 closure southbound. Left Permanent Lane 2 Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 3 Closed.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

07 August — 07 August

   

Delays likely Lane closure

 

Works location: 24/7 hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

07 August — 07 August

   

Delays likely Lane closure

 

Works location: 24/7 entry and exit slip road hardshoulder closure north and southbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

M1

07 August — 08 August

   

Delays likely Lane closure

 

Works location: Lane 1,2,3 closure southbound. Left Permanent Lane 2 Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 3 Closed.

   

Works description: M1 northbound and southbound Jct 25 to Trowell. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1286

   

M1

07 August — 08 August

   

Delays likely Road closure

 

Works location: Exit slip road closed northbound.

   

Works description: M1 northbound and southbound Jct 25 slip roads. 24/7 hardshoulder closure with narrow lanes and 50 mph speed restriction. Carriageway and lane closures for smart motorway works.

   

Responsibility for works: Highways England

   

Current status: Planned work about to start

   

Works reference: 1285

   

Town Street, Sandiacre, Long Eaton, Derbyshire

06 August — 11 August

   

Delays likely Traffic control (two-way signals)

 

Works location: MAIN IN NEARSIDE FOOTWAY OUTSIDE PEAR TREE MOORINGS @ 25 TOWN STREET

   

Works description: LAY 20M NEW DOMESTIC SERVICE FROM MAIN (3M PUBLIC)

   

Responsibility for works: Cadent

   

Current status: Planned work about to start

   

Works reference: AZ0011000737312

   

A609 Derby Road, Ilkeston, Derbyshire

31 July — 01 August

   

Delays possible Some carriageway incursion

 

Works location: ON FOOTWAY OUTSIDE NUMBER 199

   

Works description: Install external meter in boundary box at depth of under 1.5 meters by Minimum dig with Permanent Reinstatement

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9060000/00008893304

   

A609 Nottingham Road, Ilkeston, Derbyshire

03 August — 04 August

   

Delays possible Some carriageway incursion

 

Works location: Just before mini roundabout with garage on the left

   

Works description: Hand dug trial hole on behalf of O2 to establish services. Lane narrowing in place to provide a footway for pedestrians. Signing and guarding in accordance with Chapter 8. Full re-instatement

   

Responsibility for works: O2 (UK) Limited

   

Current status: Planned work about to start

   

Works reference: MG02179588-JM1

   

College Street, Long Eaton, Derbyshire

02 August — 07 August

   

Delays possible Traffic control (give & take)

 

Works location: O/S 265 CROSS C/E TO OS 267 CROSS C/W TO OS 300-296, COLLEGE STREET

   

Works description: Install 20m of 1 way poly duct in Carriageway,Install 24m of 1 way poly duct in Footway,Provide 6 core drill(s) into jointbox or building,Test 1m of existing ducts to locate blockages

   

Responsibility for works: Openreach

   

Current status: Planned work about to start

   

Works reference: BC006TI001MW500266095700

   

Salisbury Street, Long Eaton, Derbyshire

07 August — 14 August

   

Delays possible Traffic control (two-way signals)

 

Works location: MAIN LOCATED IN THE FARSIDE CARRIAGEWAY OUTSIDE NUMBERS 2A, 2B & 2CSALISBURY STREET

   

Works description: LAY 3 NEW GAS SERVICES 9 METERS FROM THE MAIN LOCATED IN THE FARSIDECARRIAGEWAY

   

Responsibility for works: Cadent

   

Current status: Planned work about to start

   

Works reference: AZ0011000737893

   

A6096 Rutland Street, Ilkeston, Derbyshire

31 July — 02 August

   

Delays unlikely No carriageway incursion

 

Works location: Outside 1

   

Works description: Interim to perm of footway

   

Responsibility for works: VIRGIN MEDIA

   

Current status: Planned work about to start

   

Works reference: NK100/SCLDMA/NNO14552

   

Albion Road, Long Eaton, Derbyshire

06 August — 18 August

   

Delays unlikely Some carriageway incursion

 

Works location: SIDE OF 50/54 ALBION ROAD

   

Works description: Notice Only -Std Sew Rep to 225mm and 3. Excavation to carry out removal of water pipe that is going the sewer pipeline Job in Carriageway

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9022102/000011901238A

   

Bonsall Street, Long Eaton, Derbyshire

07 August — 14 August

   

Delays unlikely Some carriageway incursion

 

Works location: MAIN LOCATED IN THE FARSIDE CARRIAGEWAY OPPOSITE NUMBER 36 BONSALLSTREET

   

Works description: LAY A NEW GAS SERVICE 9 METERS FROM THE MAIN LOCATED IN THE FARSIDECARRIAGEWAY

   

Responsibility for works: Cadent

   

Current status: Planned work about to start

   

Works reference: AZ0011000736427

   

Carlton Road, Long Eaton, Derbyshire

02 August — 07 August

   

Delays unlikely Some carriageway incursion

 

Works location: 29

   

Works description: INSTALL NEW MTR AND BBOX DIG IS A METER BY A METER SQUARE WE INTEND TO USE PERMASOIL

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9060000/00004401967

   

Heathfield Avenue, Larklands, Ilkeston, Derbyshire

31 July — 03 August

   

Delays unlikely Some carriageway incursion

 

Works location: 75

   

Works description: INSTALL NEW MTR AND BBOX DIG IS A METER BY A METER SQUARE WE INTEND TO USE PERMASOIL

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9060000/00008891689

   

Hillside Drive, Long Eaton, Derbyshire

01 August — 04 August

   

Delays unlikely Traffic control (give & take)

 

Works location: O/S 13

   

Works description: Boundary box Install 25mm Job in Footway (6mm Bitmac (Tarmac) )

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9081102/000011935987

   

Hope Street, Ilkeston, Derbyshire

31 July — 14 August

   

Delays unlikely Some carriageway incursion

 

Works location: Whole of street between Graham Street and Orchard Street

   

Works description: Renew 75m of existing main by the Pipeburst method. Transfer 14 shortside and 9 longside services Renew 75m of existing main by the Pipeburst method. Transfer 14 shortside and 9 longside services

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB505A6W/11330307B

   

Main Street, Long Eaton, Derbyshire

01 August — 04 August

   

Delays unlikely No carriageway incursion

 

Works location: Outside number 15

   

Works description: 1 joint hole in modular footway and 2m trenching in modular footway for new supply

   

Responsibility for works: WESTERN POWER DISTRIBUTION (MIDLANDS)

   

Current status: Planned work about to start

   

Works reference: DY543M51432065512

   

Maple Avenue, Sandiacre, Long Eaton, Derbyshire

01 August — 07 August

   

Delays unlikely Traffic control (give & take)

 

Works location: O/S 53

   

Works description: Long Comm Pipe Repair 25mm Job in Carriageway (10mm Bitmac (Tarmac) )

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9081102/000060252618

   

Shirley Street, Long Eaton, Derbyshire

05 August — 06 August

   

Delays unlikely Some carriageway incursion

 

Works location: 48

   

Works description: INSTALL NEW MTR AND BBOX DIG IS A METER BY A METER SQUARE WE INTEND TO USE PERMASOIL

   

Responsibility for works: Severn Trent Water

   

Current status: Planned work about to start

   

Works reference: LB9060000/00004398807A

   

Springfield Avenue, Sandiacre, Long Eaton, Derbyshire

31 July — 03 August

   

Delays unlikely Some carriageway incursion

 

Works location: 447606 335191 - PRIVATE - 47 SPRINGFIELD AVE SANDIACRE NOTTINGHAM NG10 5NA ,,,,,,NG10 5NA, SPRINGFIELD AVENUE

   

Works description: recover pole

   

Responsibility for works: Openreach

   

Current status: Planned work about to start

   

Works reference: BC006TI003MW500262995500

   

Stratford Street, Cotmanhay, Ilkeston, Derbyshire

02 August — 09 August

   

Delays unlikely Some carriageway incursion

 

Works location: MAIN IS LOCATED IN NEARSIDE FOOTWAY ADJACENT TO 200 COTMANHAY ROAD ONSTRATFORD STREET

   

Works description: TO DISCONNECT A GAS SERVICE PIPE

   

Responsibility for works: Cadent

   

Current status: Planned work about to start

   

Works reference: AZ0011000737553

   

Wensleydale Road, Long Eaton, Derbyshire

02 August — 07 August

   

Delays unlikely No carriageway incursion

 

Works location: OUTSIDE 19

   

Works description: UNBLOCK TEE

   

Responsibility for works: VIRGIN MEDIA

   

Current status: Planned work about to start

   

Works reference: NK100/NYNLRE/0321506

   

York Avenue, Sandiacre, Long Eaton, Derbyshire

01 August — 04 August

   

Delays unlikely No carriageway incursion

 

Works location: O/S 39 , YORK AVENUE

   

Works description: Build 1 concrete chamber 1310mm x 610mm x 1265mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s)

   

Responsibility for works: Openreach

   

Current status: Planned work about to start

   

Works reference: BC006TI001MW500265627002

   

Rail Information

Live Departure Boards:
Long Eaton Railway Station | Ilkeston Railway Station

National Rail Enquiries:
0345 7 48 49 50 | www.nationalrail.co.uk

Journey Planning
Compare route options for buses, trains and trams for your journey across the East Midlands: www.travelineeastmidlands.co.uk

Bus Information

Trent Barton: www.trentbarton.co.uk

YourBus: www.catchyourbus.co.uk

Littles Travel: 0115 932 8581 www.littlestravel.co.uk

Derbyshire County Council Bus Line: 01332 292200

Bus Timetables: www.derbysbus.info/times